New Interpretation Centre for Wessex Water
This glulam timber framed building was constructed
with sustainable building materials wherever
possible and utilised recycled aggregates as well
as wall insulation made from recycled paper.
Strengthening of Existing Balcony, Eastern and Western Mansions
An existing Georgian balcony had become unsafe
due to corrosion of the cast iron cantilever
support brackets. DEA designed a strengthening
scheme which included replacing existing brackets
and creating a new support structure hidden behind
existing decorative columns. DEA won an award for
this scheme from the Weston super Mare Civic Society.